The annual turnover of
Yinbang has exceed 4 billion RMB , and Anhui Huaibei new factory lays
foundation.
2022
Project of renewable
low-carbon aluminum heat transfer materials for new energy vehicles with an
annual output 350,000 tons was successfully signed.
2021
Flux-included and
Flux-less materials start small batch supply.
2020
In 2020 The turnover of Yinbang has exceeded over 2.3
billionRMB
2019
In 2019 The turnover of Yinbang has exceeded over 2
billionRMB
2018
In September 2018 Acquisitionof Guizhou Liyang Tianxiang
Technology Co., Ltd
In December 2018 Yinbang hasSelf developed and produced cooling
power battery materials for new energy vehicles are widely used in the field of
new energy
2016
In February 2016 The new investment for laminated metal composite
production line was fully commissioned. The annual production capacity reaches
300,000 tons
2013
In 2013 The turnover of Yinbang has exceeded over 1.5
billionRMB
2012
In July 2012 Yinbang Group was successfully listing in the
Shenzhen stock market
In September 2012 Falcon Technology Co.,Ltd was officially
registered and established
2011
In October 2011 200,000 tons laminated metal composite material
expansion project laid the foundation
2010
In April 2010 Jiangsu Academician Workstation and Engineering
and Technological Research Center were set up in Yinbang
In 2010 The turnover of Yinbang has exceeded over 1
billionRMB
2009
In October 2009 Yinbang hassuccessfully researched and developedAl-clad
carbon-steel materials which filled the domestic gap. Yinbang began to enter
the multi-metal clad material field
2006
In 2006 The turnover of Yinbang has exceeded over 500
million RMB
2005
In July 2005 Yinbang has successfully researched and
developed brazing aluminum clad materials and became as one of the biggest
production-scale company in China
2003
In 2003 The turnover of Yinbang has exceeded over 100
million RMB
2000
In 2000 The turnover of Yinbang has exceeded over 50
million RMB
1998
In August 1998 Yinbang switched to private company
1988
Established in June 1988 2 set for2 roller cold mill were main facility
of Yinbang